NASA-LLIS-1854: Lessons Learned - KSC Checkout and Launch Control System (CLCS) - General Lessons
Abstract: Abstract:
The CLCS project was initiated in FY 1997 to modernize the Launch Processing System (LPS) that was engineered and developed in the 1970s. The modernization was needed to ensure continued safe ...
The CLCS project was initiated in FY 1997 to modernize the Launch Processing System (LPS) that was engineered and developed in the 1970s. The modernization was needed to ensure continued safe ...
NASA-LLIS-1851: Lessons Learned - KSC Checkout and Launch Control System (CLCS) - Project, Systems, SM&A
Abstract: Abstract:
The CLCS project was initiated in FY 1997 to modernize the Launch Processing System (LPS) that was engineered and developed in the 1970s. The modernization was needed to ensure continued safe ...
The CLCS project was initiated in FY 1997 to modernize the Launch Processing System (LPS) that was engineered and developed in the 1970s. The modernization was needed to ensure continued safe ...
NASA-LLIS-1728: Lessons Learned – Space Shuttle - Designing Environments Tests for Sustainability
Abstract: Abstract:
n support of foam redesign options, ET project was required to repeat wind tunnel testing for revised environments. Because data on the original test configuration was sketchy, due in part ...
n support of foam redesign options, ET project was required to repeat wind tunnel testing for revised environments. Because data on the original test configuration was sketchy, due in part ...
NASA-LLIS-1850: Lessons Learned - Lessons Learned from the KSC Checkout and Launch Control System (CLCS) - Final Briefing
Abstract: Abstract:
The CLCS project was initiated in FY 1997 to modernize the Launch Processing System (LPS) that was engineered and developed in the 1970s. The modernization was needed to ensure continued safe ...
The CLCS project was initiated in FY 1997 to modernize the Launch Processing System (LPS) that was engineered and developed in the 1970s. The modernization was needed to ensure continued safe ...
NASA-LLIS-1806: Lessons Learned – Capture of Apollo Lunar Module Reliability Lessons Learned: Program/Engineering Management
Abstract: Abstract:
A July 2007 workshop attended by Constellation Program personnel traced the success of the Apollo Lunar Module designers to the NASA and contractor culture, Grumman's flat organization ...
A July 2007 workshop attended by Constellation Program personnel traced the success of the Apollo Lunar Module designers to the NASA and contractor culture, Grumman's flat organization ...
NASA-LLIS-2257: Lessons Learned – Orbiting Carbon Observatory (OCO) Launch Vehicle Mishap Investigation Results
Abstract: Abstract:
The February 2009 OCO mission failed to attain orbit aboard a Taurus launch vehicle, and the OCO satellite payload was lost. A mishap investigation board identified four potential causes that ...
The February 2009 OCO mission failed to attain orbit aboard a Taurus launch vehicle, and the OCO satellite payload was lost. A mishap investigation board identified four potential causes that ...
NASA-LLIS-2376: Lessons Learned - Cosmic Background Explorer (COBE) On Orbit Engineering Performance
Abstract: Abstract:
The Cosmic Background Explorer (COBE) successfully launched on November 18, 1989, following a postponement due the the Challenger Shuttle Accident. The spacecraft enabled NASA scientist Dr. ...
The Cosmic Background Explorer (COBE) successfully launched on November 18, 1989, following a postponement due the the Challenger Shuttle Accident. The spacecraft enabled NASA scientist Dr. ...
NASA-LLIS-1844: Lessons Learned - STS-122 ECO Sensor Anomaly
Abstract: Abstract:
This report documents lessons learned as a result of investigating failures of Engine Cutoff (ECO) sensors during launching of STS-122. Several overriding themes were identified from interviews ...
This report documents lessons learned as a result of investigating failures of Engine Cutoff (ECO) sensors during launching of STS-122. Several overriding themes were identified from interviews ...
NASA-LLIS-6036: Lessons Learned - Ground Umbilical Carrier Assembly Gaseous Hydrogen Leak Investigation
Abstract: A gaseous hydrogen (GH2) leak occurred on 03/11/09, during the STS-119/ET-127 cryogenic loading for flight, and was repaired with a "fix to fly" approach by replacing the flight seal and the Ground Umbilical Carrier Assembly ...