Search
Now showing items 43311-43317 of 43317
MIL-DTL-85097E: USN/USMC PROPELLANT ACTUATED DEVICES (PADS), GENERAL SPECIFICATION FOR
Abstract: This specification covers the requirements for propellant actuated devices (PADS) used in aircrew escape systems. The requirements common to all such devices are in this specification; requirements unique to individual ...
DSCC-DWG-10012: PRINTED WIRING BOARD, RIGID, MULTILAYERED, GENERAL DRAWING
Abstract: This drawing describes the requirements for a family of rigid multilayered printed wiring boards that contain plated through holes. Some design may also have blind vias, buried vias, or a combination of both. Printed wiring ...
DODD 7000.14-R VOL 12 CHAP 11: PRIVATIZATION OF DEFENSE UTILITY SYSTEMS
Abstract: Purpose
This chapter prescribes financial management policies and procedures for the implementation of statutory provisions of Title 10, United States Code (U.S.C.), Section 2688 (10 U.S.C. 2688), "Utility Systems: Conveyance Authority." Section 2688 permits the Secretary of a Military Department to convey (i.e., transfe...
This chapter prescribes financial management policies and procedures for the implementation of statutory provisions of Title 10, United States Code (U.S.C.), Section 2688 (10 U.S.C. 2688), "Utility Systems: Conveyance Authority." Section 2688 permits the Secretary of a Military Department to convey (i.e., transfe...
NASA-LLIS-1370: Lessons Learned – Lessons Learned From Flights of ?Off the Shelf? Aviation Navigation Units on the Space Shuttle, GPS
Abstract: Abstract:
Over the last 9 years, the Shuttle program has flown Global Positioning System (GPS) receivers and Space Integrated GPS/Inertial Navigation System (SIGI) units. The NASA Johnson Space Center ...
Over the last 9 years, the Shuttle program has flown Global Positioning System (GPS) receivers and Space Integrated GPS/Inertial Navigation System (SIGI) units. The NASA Johnson Space Center ...
NASA-LLIS-0910: Lessons Learned – Corporate Organizational Changes
Abstract: Description of Driving Event:
Numerous cost, schedule, technical and programmatic problems due to Prime Contractor's closure of East Coast production facility and program relocation to West Coast. Also, ...
Numerous cost, schedule, technical and programmatic problems due to Prime Contractor's closure of East Coast production facility and program relocation to West Coast. Also, ...