ASCE EWRI/ASCE 34-01: Standard Guidelines for Artifical Recharge of Ground Wate
Abstract: These Standard Guidelines describe the steps necessary to plan, design, construct, maintain, operate, and close a system to recharge ground water in a manner not occurring in nature, and to enhance ground water recharge ...
ASCE 28-00: Standard Practice for Direct Design of Precast Concrete Box Sections for Jacking in Trenchless Construction
Abstract: This Practice covers design and recommended installation procedures for precast concrete box sections for jacking in trenchless construction intended for the conveyance of sewage, industrial wastes, storm water and drainage ...
ASCE 36-01: Standard Construction Guidelines for Microtunneling - Errata
Abstract: This standard guideline covers the planning, design, pipe materials, and construction of microtunneling. Microtunneling is defined as a trenchless construction method for installing pipelines. The North American definition ...
ASCE 32-01: Design and Construction of Frost-Protected Shallow Foundations
Abstract: This Standard addresses the design and construction of frost-protected shallow foundations to prevent frost damage in cold climates with seasonal ground freezing. For the purpose of this Standard, a frost-protected shallow ...