Search
Now showing items 1-5 of 5
ACI 211.1: Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete
Abstract: This Standard Practice describes methods for selecting proportions for hydraulic cement concrete made with and without other cementitious materials and chemical admixtures. This concrete consists of normal and/or highdensity ...
ACI 304.2R: Placing Concrete by Pumping Methods
Abstract: INTRODUCTION
ACI defines pumped concrete as concrete that is transported through hose or pipe by means of a pump. Pumping concrete through metal pipelines by piston pumps was introduced in the United ...
ACI defines pumped concrete as concrete that is transported through hose or pipe by means of a pump. Pumping concrete through metal pipelines by piston pumps was introduced in the United ...
ACI SP-209: Innovations in Design with Emphasis on Seismic, Wind, and Environmental Loading; Quality Control and Innovations in Materials/Hot-Weather Concreting
Abstract: Synopsis: This paper provides results of different types of curing in hot weather environment on the compressive strength of concrete made with portland cement and complementary cementitious materials ...
ACI 207.3R: Practices for Evaluation of Concrete in Existing Massive Structures for Service Conditions
Abstract: This report focuses on practices used to evaluate concrete in existing massive structures. Design considerations, evaluation of existing operating records and past inspection reports, condition surveys, maintenance reports, ...