Show simple item record

Fossil Fuel Power Plant Instrument Piping Installation

contributor authorISA - International Society of Automation
date accessioned2017-09-04T15:13:42Z
date available2017-09-04T15:13:42Z
date copyright01/01/1994 (R 2010)
date issued2010
identifier otherMBBYHDAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsein=author:%22NAVY%20-%20YD%20-%20Naval%20Facilities%114ngineering%20Command%22/handle/yse/12420
description abstractThis standard covers the mechanical design, engineering, fabrication, installation, testing, and protection of fossil power plant instrumentation sensing and control lines. The boundaries of this standard span the process tap root valve to the instrument connection. This standard applies to all fluid media (liquid, gas, or vapor).
Purpose
This standard establishes the applicable installation requirements and limits of instrumentation sensing and control lines and their instruments in fossil power plants.
This standard addresses the requirements of maintaining the pressure boundary integrity of the instrumentation sensing line (in accordance with the appropriate parts of American National Standards Institute [ANSI] standards).
languageEnglish
titleISA 77.70.02num
titleFossil Fuel Power Plant Instrument Piping Installationen
typestandard
page35
statusActive
treeISA - International Society of Automation:;2010
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record