Show simple item record

Green peel bond procedure at the corrugato

contributor authorTAPPI - TAPPI
date accessioned2017-09-04T15:21:04Z
date available2017-09-04T15:21:04Z
date copyright2012.01.01
date issued2012
identifier otherMYGIZEAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=auth=177/handle/yse/21069
description abstractThis procedure is to provide basic instructions for subjective testing of the corrugated bond at both the single facer and doublebacker glue lines. The combined board should be allowed to cool for approximately 10 minutes at the dry end of the corrugator before evaluation.
languageEnglish
titleTAPPI UM 822num
titleGreen peel bond procedure at the corrugatoen
typestandard
page5
statusActive
treeTAPPI - TAPPI:;2012
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record