• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0278

Lessons Learned – Inadequate Time Allocated for Planning for DSN Support

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1993

Abstract: Abstract:
Planning for the two-spacecraft Voyager mission did not consider the extra time needed to arrange for the allocation of Deep Space Network (DSN) coverage for the operation of both spacecraft. Lead times for project and institutional planning must be considered at the time the project mission operations plan is being developed.
URI: http://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/181730
Subject: Administration/Organization
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.00Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0278

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:58:39Z
date available2017-09-04T17:58:39Z
date copyright07/12/1993
date issued1993
identifier otherFRZCQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/181730
description abstractAbstract:
Planning for the two-spacecraft Voyager mission did not consider the extra time needed to arrange for the allocation of Deep Space Network (DSN) coverage for the operation of both spacecraft. Lead times for project and institutional planning must be considered at the time the project mission operations plan is being developed.
languageEnglish
titleNASA-LLIS-0278num
titleLessons Learned – Inadequate Time Allocated for Planning for DSN Supporten
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1993
contenttypefulltext
subject keywordsAdministration/Organization
subject keywordsFlight Operations
subject keywordsGround Operations
subject keywordsPolicy & Planning
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian