• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0468

Lessons Learned - Operation Training for KSC Personnel

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1993

Abstract: Description of Driving Event:
During ground operations at KSC, the first United States Microgravity Laboratory (USML-1) did not allow contingency time for the development and installation/test of new hardware. Delivery of a new Payload General Support Computer-Data Display System (PGSC-DDS) did not support the scheduled start of systems test. Also, training was not planned for the Master Memory Unit (MMU) tester and the PGSC unit tester.
URI: http://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/181759
Subject: Administration/Organization
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (12.74Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0468

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:58:40Z
date available2017-09-04T17:58:40Z
date copyright34281
date issued1993
identifier otherFSBEQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/181759
description abstractDescription of Driving Event:
During ground operations at KSC, the first United States Microgravity Laboratory (USML-1) did not allow contingency time for the development and installation/test of new hardware. Delivery of a new Payload General Support Computer-Data Display System (PGSC-DDS) did not support the scheduled start of systems test. Also, training was not planned for the Master Memory Unit (MMU) tester and the PGSC unit tester.
languageEnglish
titleNASA-LLIS-0468num
titleLessons Learned - Operation Training for KSC Personnelen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1993
contenttypefulltext
subject keywordsAdministration/Organization
subject keywordsGround Operations
subject keywordsHardware
subject keywordsPolicy & Planning
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian