Show simple item record

Lessons Learned - LH2 Leakage at the 8" T-0 Flexhose QD/Interface

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:59:20Z
date available2017-09-04T17:59:20Z
date copyright08/19/1992
date issued1992
identifier otherFTYCQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/182443
description abstractDescription of Driving Event:
The 8 inch T-0 flexhose connects the tail service mast (TSM) with the LH2 carrier plate. Due to mechanical design the interface connection is very poor. The LO2 interface is identical and has experienced leakage in the past. Undetected leakage could cause a major fire resulting loss of life or vehicle.
languageEnglish
titleNASA-LLIS-0107num
titleLessons Learned - LH2 Leakage at the 8" T-0 Flexhose QD/Interfaceen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1992
contenttypefulltext
subject keywordsEnergetic Materials - Explosive/Propellant/Pyrotechnic
subject keywordsFire Protection
subject keywordsFlight Equipment
subject keywordsGround Equipment
subject keywordsLaunch Vehicle


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record