Show simple item record

Conduct a Final Mechanical Walkdown Prior to Spacecraft Integration with the Launch Vehicle

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:08:41Z
date available2017-09-04T18:08:41Z
date copyright41207
date issued2012
identifier otherGSJYAFAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/191671
description abstractWhere previous JPL spaceflight projects relied solely on interim inspections and walkdowns during ATLO, the in-house MSL project conducted a formal, final, mechanical walkdown of the as-built configuration prior to vehicle stacking at the launch site. Because NuSTAR was an out-of-house build, an assessment and final walkdown was performed independent of the system contractor that similarly produced findings and observations. Conduct a final mechanical walkdown of the spacecraft prior to stacking or encapsulation for launch.
languageEnglish
titleNASA-LLIS-6636num
titleConduct a Final Mechanical Walkdown Prior to Spacecraft Integration with the Launch Vehicleen
typestandard
page4
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2012
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record