Lessons Learned - Loads Imposed on Stabilizing Frame During Mate/demate Operations

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:20:16Z
date available2017-09-04T18:20:16Z
date copyright08/19/1992
date issued1992
identifier otherHVYCQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/202864
description abstractDescription of Driving Event:
The H70-0743 sling assembly consists of a forward and aft spreader beam assembly connected together by a segmented stabilizing frame assembly. With the two mobile crane concept, the sling assembly is used to lift and demate the orbiter to the shuttle carrier aircraft. At the contingency landing site, the two mobile crane concept is used with a 800-ton T-C 4000 truck crane for the aft lift and a 250-ton link belt for the forward lift. Visual observation must be maintained at all times during hoisting operations due to extremely limited clearances between the orbiter and facilities.
languageEnglish
titleNASA-LLIS-0123num
titleLessons Learned - Loads Imposed on Stabilizing Frame During Mate/demate Operationsen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1992
contenttypefulltext
subject keywordsGround Operations
subject keywordsIndustrial Operations
subject keywordsLifting Devices
subject keywordsTransportation