UFC 3-440-05N CHANGE 2
TROPICAL ENGINEERING
| contributor author | UFC - Unified Facilities Criteria | |
| date accessioned | 2017-09-04T15:31:44Z | |
| date available | 2017-09-04T15:31:44Z | |
| date copyright | 39049 | |
| date issued | 2006 | |
| identifier other | OEMTXEAAAAAAAAAA.pdf | |
| identifier uri | http://yse.yabesh.ir/std;jsessionid=190419C4AB017808E65B78A0B48BF7AE/handle/yse/33252 | |
| description abstract | PURPOSE AND SCOPE. This UFC is comprised of two sections. Chapter 1 introduces this UFC and provides a listing of references to other Tri-Service documents closely related to the subject. Appendix A contains the full text copy of the previously released Military Handbook (MIL-HDBK) on this subject. This UFC serves as criteria until such time as the full text UFC is developed from the MIL-HDBK and other sources. This UFC provides general criteria for tropical engineering. Note that this document does not constitute a detailed technical design, maintenance or operations manual, and is issued as a general guide to the considerations associated with tropical engineering. | |
| language | English | |
| title | UFC 3-440-05N CHANGE 2 | num |
| title | TROPICAL ENGINEERING | en |
| type | standard | |
| page | 92 | |
| status | Active | |
| tree | UFC - Unified Facilities Criteria:;2006 | |
| contenttype | fulltext |

درباره ما