The Commissioning Process for Smoke Control Systems

contributor authorASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc
date accessioned2018-10-06T07:10:39Z
date available2018-10-06T07:10:39Z
date copyright2017.10.24
date issued2017
identifier otherUGCUCGAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsessionid=435F2D89F77216F55ECC40BAF539160F/handle/yse/265189
description abstractThe procedures, methods, and documentation requirements in this guideline describe the application of the Commissioning (Cx) Process for each project delivery phase, from Predesign through Occupancy/Operations, for all types and sizes of smoke control systems, to support the Cx Process activities described in ASHRAE Guideline 0 1 and ASHRAE Standard 202 2. Requirements include the following: a. Smoke control systems to fully support the Cx Process activities b. Verification during each phase of the Cx Process c. Acceptance during each phase d. Documentation during each phase e. A systems manual f. Training for operations and maintenance (O&M) personnel and occupants  The procedures, methods, and documentation requirements apply to new construction and ongoing Cx Process activities or requirements for all or portions of buildings and facilities. They also can be applied to rehab, retrocommissioning, or recommissioning projects. PURPOSE The purpose of this guideline is to describe the technical requirements for applying the Commissioning (Cx) Process, described in ASHRAE Guideline 0 1 and Standard 202 2, that will verify that the smoke control system fulfills the Owner’s Project Requirements (OPR).
languageEnglish
titleASHRAE GUIDELINE 1.5num
titleThe Commissioning Process for Smoke Control Systemsen
typestandard
page36
statusActive
treeASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc:;2017
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record