• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • AIAA - American Institute of Aeronautics and Astronautics
  • View Item
  •   YSE
  • Industrial Standards
  • AIAA - American Institute of Aeronautics and Astronautics
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

AIAA R-092-2

Wind Tunnel Testing Part 2: Practitioners Volume

Organization:
AIAA - American Institute of Aeronautics and Astronautics
Year: 2003

Abstract: Introduction
The purpose of this recommended practice document is to provide the reader with increased knowledge about planning and executing highly successful wind tunnel tests. First, an overview of the test process is provided, giving a general picture of the origin, purpose, and high-level breakdown of activities that are a part of wind tunnel test development and execution. Secondly, detail is added to the overview to define the full scope of the activities and key considerations. Finally, recommended practices and lessons learned are described.
Part I of this recommended practice looked at test development from a management perspective. This volume (Part Il) will provide additional detail that is more useful to participants who develop and execute testing activities. Part II is organized into sections describing activities and best practices during the various stages of test implementation:
• Program development
• Pretest planning and preparation
• Model development and fabrication
• Pretest buildup and preparation
• Testing
• Post-test activities
Part II of this recommended practice document was assembled with guidance from experts (both industry and government) who are responsible for all aspects of wind tunnel testing. Experts from airframe companies (military and commercial), as well as model makers and tunnel operators contributed best practices to help guide test personnel through the implementation and execution of a test project.
URI: http://yse.yabesh.ir/std;jsessionid=47037D83FCDCAC426159DD6E273C9FCD/handle/yse/172182
Collections :
  • AIAA - American Institute of Aeronautics and Astronautics
  • Download PDF : (325.3Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    AIAA R-092-2

Show full item record

contributor authorAIAA - American Institute of Aeronautics and Astronautics
date accessioned2017-09-04T17:48:58Z
date available2017-09-04T17:48:58Z
date copyright2003.01.01
date issued2003
identifier otherESQFEBAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsessionid=47037D83FCDCAC426159DD6E273C9FCD/handle/yse/172182
description abstractIntroduction
The purpose of this recommended practice document is to provide the reader with increased knowledge about planning and executing highly successful wind tunnel tests. First, an overview of the test process is provided, giving a general picture of the origin, purpose, and high-level breakdown of activities that are a part of wind tunnel test development and execution. Secondly, detail is added to the overview to define the full scope of the activities and key considerations. Finally, recommended practices and lessons learned are described.
Part I of this recommended practice looked at test development from a management perspective. This volume (Part Il) will provide additional detail that is more useful to participants who develop and execute testing activities. Part II is organized into sections describing activities and best practices during the various stages of test implementation:
• Program development
• Pretest planning and preparation
• Model development and fabrication
• Pretest buildup and preparation
• Testing
• Post-test activities
Part II of this recommended practice document was assembled with guidance from experts (both industry and government) who are responsible for all aspects of wind tunnel testing. Experts from airframe companies (military and commercial), as well as model makers and tunnel operators contributed best practices to help guide test personnel through the implementation and execution of a test project.
languageEnglish
titleAIAA R-092-2num
titleWind Tunnel Testing Part 2: Practitioners Volumeen
typestandard
page54
statusActive
treeAIAA - American Institute of Aeronautics and Astronautics:;2003
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian