• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-3376

Lessons Learned – Inadequate Software Testing

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2011

Abstract: Abstract:
Multiple problems were uncovered with a launch display application software program. Inadequate unit and integrated software testing can result in delivering a poor quality product. It is important to match the software test configurations to the operational environment and scenarios in which they will be used to verify the full nature of the software changes being implemented.
URI: http://yse.yabesh.ir/std;query=autho47037D83FCDCAC426159DD6EFDEC014A/handle/yse/228349
Subject: Ground processing and manifesting
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (58.80Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-3376

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:47:09Z
date available2017-09-04T18:47:09Z
date copyright02/28/2011
date issued2011
identifier otherKLHOEEAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=autho47037D83FCDCAC426159DD6EFDEC014A/handle/yse/228349
description abstractAbstract:
Multiple problems were uncovered with a launch display application software program. Inadequate unit and integrated software testing can result in delivering a poor quality product. It is important to match the software test configurations to the operational environment and scenarios in which they will be used to verify the full nature of the software changes being implemented.
languageEnglish
titleNASA-LLIS-3376num
titleLessons Learned – Inadequate Software Testingen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2011
contenttypefulltext
subject keywordsGround processing and manifesting
subject keywordsGround support systems
subject keywordsLaunch support systems
subject keywordsSoftware Engineering
subject keywordsTraining and simulation systems
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian