Abstract: Abstract:
When a GSE power meter registered zero due to an AC power glitch, the test monitoring and control software interpreted this as a loss of power and increased the test level past the maximum rating of the test article. This ground test error could have damaged flight hardware. Perform FMEA on test equipment to identify all potential GSE-induced failure modes. Either program the test control software or insert a limiting hardware device to prevent overtest.
When a GSE power meter registered zero due to an AC power glitch, the test monitoring and control software interpreted this as a loss of power and increased the test level past the maximum rating of the test article. This ground test error could have damaged flight hardware. Perform FMEA on test equipment to identify all potential GSE-induced failure modes. Either program the test control software or insert a limiting hardware device to prevent overtest.
Subject: facility power
Show full item record
contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
date accessioned | 2017-09-04T18:48:25Z | |
date available | 2017-09-04T18:48:25Z | |
date copyright | 38271 | |
date issued | 2004 | |
identifier other | KOWEQCAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std;query=author:%22NAV081DAC4261598F1EFDEC014A/handle/yse/229714 | |
description abstract | Abstract: When a GSE power meter registered zero due to an AC power glitch, the test monitoring and control software interpreted this as a loss of power and increased the test level past the maximum rating of the test article. This ground test error could have damaged flight hardware. Perform FMEA on test equipment to identify all potential GSE-induced failure modes. Either program the test control software or insert a limiting hardware device to prevent overtest. | |
language | English | |
title | NASA-LLIS-1529 | num |
title | Lessons Learned - Ensure Test Monitoring Software Imposes Limits to Prevent Overtest (2003) | en |
type | standard | |
page | 3 | |
status | Active | |
tree | NASA - National Aeronautics and Space Administration (NASA):;2004 | |
contenttype | fulltext | |
subject keywords | facility power | |
subject keywords | fault protection | |
subject keywords | Flight Operations | |
subject keywords | Ground Equipment | |
subject keywords | Hardware | |
subject keywords | High Power RF Breakdown Facility | |
subject keywords | Payloads | |
subject keywords | power limits | |
subject keywords | RF breakdown | |
subject keywords | RF test | |
subject keywords | Software | |
subject keywords | Spacecraft | |
subject keywords | Test & Verification | |
subject keywords | Test Article | |
subject keywords | test failure | |
subject keywords | test overstress | |
subject keywords | test software | |
subject keywords | test-induced failure |