NASA-LLIS-1743
Lessons Learned – Mitigating the Risk of Single String Spacecraft Architecture
Year: 2006
Abstract: Abstract:
Mars Exploration Rover met and exceeded mission requirements despite a largely single string spacecraft architecture. Balance the risk of a single string flight system with effective risk management, ample fault tolerance, flight system flexibility, access to experienced designers, ample stress testing, use of proven designs, and a rigorous approach to fault protection.
Mars Exploration Rover met and exceeded mission requirements despite a largely single string spacecraft architecture. Balance the risk of a single string flight system with effective risk management, ample fault tolerance, flight system flexibility, access to experienced designers, ample stress testing, use of proven designs, and a rigorous approach to fault protection.
Subject: Additional Categories.
Show full item record
contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
date accessioned | 2017-09-04T18:48:26Z | |
date available | 2017-09-04T18:48:26Z | |
date copyright | 04/07/2006 | |
date issued | 2006 | |
identifier other | KOXCQCAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std;query=author:%22NAVY%20-%20YD%20-%20Naval%20Facilities%20Engineering%20Command%22/handle/yse/229727 | |
description abstract | Abstract: Mars Exploration Rover met and exceeded mission requirements despite a largely single string spacecraft architecture. Balance the risk of a single string flight system with effective risk management, ample fault tolerance, flight system flexibility, access to experienced designers, ample stress testing, use of proven designs, and a rigorous approach to fault protection. | |
language | English | |
title | NASA-LLIS-1743 | num |
title | Lessons Learned – Mitigating the Risk of Single String Spacecraft Architecture | en |
type | standard | |
page | 5 | |
status | Active | |
tree | NASA - National Aeronautics and Space Administration (NASA):;2006 | |
contenttype | fulltext | |
subject keywords | Additional Categories. | |
subject keywords | Additional Categories.Environment | |
subject keywords | Additional Categories.Flight Equipment | |
subject keywords | Additional Categories.Flight Operations | |
subject keywords | Additional Categories.Hardware | |
subject keywords | Additional Categories.Payloads | |
subject keywords | Additional Categories.Risk Management/Assessment | |
subject keywords | Additional Categories.Software | |
subject keywords | Additional Categories.Spacecraft | |
subject keywords | Additional Categories.Test Facility | |
subject keywords | Engineering Design (Phase C/D). | |
subject keywords | Engineering Design (Phase C/D).Lander Systems | |
subject keywords | Engineering Design (Phase C/D).Robotics | |
subject keywords | Engineering Design (Phase C/D).Spacecraft and Spacecraft Instruments | |
subject keywords | Missions and Systems Requirements Definition. | |
subject keywords | Missions and Systems Requirements Definition.Level 0/1 Requirements | |
subject keywords | Missions and Systems Requirements Definition.Planetary entry and landing concepts | |
subject keywords | Missions and Systems Requirements Definition.Requirements critical to costing and cost credibility | |
subject keywords | Program Management. | |
subject keywords | Program Management.Acquisition / procurement strategy and planning | |
subject keywords | Program Management.Contractor relationships | |
subject keywords | Program Management.Program planning | |
subject keywords | development | |
subject keywords | and management | |
subject keywords | Program Management.Risk management | |
subject keywords | Safety and Mission Assurance. | |
subject keywords | Safety and Mission Assurance.Early requirements and standards definition | |
subject keywords | Safety and Mission Assurance.Reliability | |
subject keywords | Systems Engineering and Analysis. | |
subject keywords | Systems Engineering and Analysis.Mission and systems trade studies | |
subject keywords | Systems Engineering and Analysis.Mission definition and planning |