Abstract: General applicability
This standard defines procedures and specifications for loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I (Electrical & Instrument) installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).
This standard defines procedures and specifications for loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I (Electrical & Instrument) installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).
Collections
:
Show full item record
| contributor author | ISA - International Society of Automation | |
| date accessioned | 2017-09-04T15:57:51Z | |
| date available | 2017-09-04T15:57:51Z | |
| date copyright | 06/05/2012 | |
| date issued | 2012 | |
| identifier other | RBKOXEAAAAAAAAAA.pdf | |
| identifier uri | http://yse.yabesh.ir/std;quein=autho4/handle/yse/61103 | |
| description abstract | General applicability This standard defines procedures and specifications for loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I (Electrical & Instrument) installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter). | |
| language | English | |
| title | ISA 62382 | num |
| title | Automation Systems in the Process Industry − Electrical and Instrumentation Loop Check | en |
| type | standard | |
| page | 30 | |
| status | Active | |