Show simple item record

|French -- Systèmes de production d’énergie photovoltaïque - Exigences de CEM et méthodes d’essai pour les équipements de conversion de puissance - Edition 1.0Photovoltaic power generating systems - EMC requirements and test methods for power conversion e

contributor authorIEC - International Electrotechnical Commission
date accessioned2018-07-31T09:58:25Z
date available2018-07-31T09:58:25Z
date copyright2017.07.01
date issued2017
identifier otherNKQYAGAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsessiouthor:%22NAVY%20-%20YD%20-/handle/yse/264564
description abstractThis document specifies electromagnetic compatibility (EMC) requirements for DC to AC power conversion equipment (PCE) for use in photovoltaic (PV) power systems. The PCE covered by this document can be grid-interactive, which is termed as a grid connected power converter (GCPC), or stand-alone. It can be supplied by single or multiple photovoltaic modules grouped in various array configurations, and can be intended for use in conjunction with batteries or other forms of energy storage. NOTE A micro inverter is an example of a GCPC supplied by a single photovoltaic module. This document covers not only PCE connected to a public low voltage AC mains network or other low voltage AC mains installation, but also PCE connected to a medium or high voltage AC network with or without step-down power transformers. Requirements for the PCE connected to a medium or high voltage AC network are specified in this document. However, some requirements relevant to grid interconnection are addressed with other standards specifying power quality or their own grid codes in some countries. NOTE DC/DC converters used for PV systems are not yet covered in this document. They can cause electromagnetic interference due to conducted disturbances at DC ports. PCE is assessed with EMC requirements as a type test at a test site. This document provides test methods and test conditions for PCE as well as emission and immunity requirements, but not for photovoltaic modules and other balance of system components. When compliance with EMC requirements at the test site cannot be shown due to technical reasons of the test site, PCE can be assessed in situ, such as at the manufacturer’s premises or in the field where the PCE is assembled into a PV power system. However, only high frequency emission requirements for in situ assessment are specified in CISPR 11.
languageEnglish
languageFrench
titleIEC 62920num
title|French -- Systèmes de production d’énergie photovoltaïque - Exigences de CEM et méthodes d’essai pour les équipements de conversion de puissance - Edition 1.0Photovoltaic power generating systems - EMC requirements and test methods for power conversion een
typestandard
page112
statusActive
treeIEC - International Electrotechnical Commission:;2017
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record