Show simple item record

ASHRAE 90307

contributor authorASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
date accessioned2020-07-27T20:51:24Z
date available2020-07-27T20:51:24Z
date issued2018
identifier otherMQMWGGAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=autho162/handle/yse/280442
description abstractINTRODUCTION TO THE COMMISSIONING PROCESS This chapter serves as a high-level strategic commissioning description that provides stakeholders with a basis for understanding enhanced delivery of new and existing building projects. It describes the value, benefits, and rationale for verifying and documenting that all of the commissioned systems and assemblies are planned, designed, installed, tested, operated, and maintained to meet the Owner’s Project Requirements (OPR) for new construction and/or major renovations. This guide is intended to establish and maintain consistent high-level commissioning goals and objectives, including performance, cost-effectiveness, consistency, and best practices. Commissioning can be applied to nearly all building systems and equipment
languageEnglish
titleCommissioning Stakeholders’ Guideen
titleASHRAE 90307num
typestandard
page122
statusActive
treeASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2018
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record