Show simple item record

INDUSTRIAL VENTILATION

contributor authorUFC - Unified Facilities Criteria
date accessioned2017-09-04T16:19:44Z
date available2017-09-04T16:19:44Z
date copyright38285
date issued2004
identifier otherTIYOJBAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=autho16237D83FCDCAC426159DD6E273C9FCD/handle/yse/83177
description abstractThis Unified Facilities Criteria (UFC) provides criteria for the design of ventilation systems that control contaminants generated from industrial processes.
PURPOSE OF CRITERIA.
Criteria are developed to define requirements during the design of industrial ventilation systems. Chapter 2 provides general criteria and Chapters 3 through 10 provide criteria for specific processes. Use the general criteria presented in Chapter 2 along with the applicable specific criteria presented in Chapters 3 through 10 to design the ventilation system. For all other ventilation applications, use the criteria in Chapter 2.
Criteria contained in this UFC should be interpreted as the minimum required and should be improved where current technology or situation warrants. Users of this UFC are advised to consult the most current edition of the standards.
This UFC does not incorporate individual state and local environmental requirements. It is the sole responsibility of the cognizant design personnel to design an industrial ventilation system that complies with state and local environmental requirements.
languageEnglish
titleUFC 3-410-04Nnum
titleINDUSTRIAL VENTILATIONen
typestandard
page93
statusActive
treeUFC - Unified Facilities Criteria:;2004
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record