MSFC-RQMT-3458 REV B
LAB-ON-A-CHIP APPLICATION DEVELOPMENT (LOCAD) PORTABLE TEST SYSTEM (PTS) REQUIREMENTS, VERIFICATION, & COMPLIANCE (RVC)
Organization:
MSFC - NASA - MSFC - Marshall Space Flight Center
Year: 2006
Abstract: The RVC database documents system level interface, performance, and safety requirements for the LOCAD PTS. These requirements are the basis for a verification program that will yield compliance data to demonstrate that the LOCAD PTS satisfies performance, functionality, safety, and interface requirements. These verification requirements will ensure that the LOCAD PTS has the capability to perform mission objectives both safely and efficiently for launch on the STS-116 (12A.1).
Purpose.
This document establishes an “end-to-end” verification program for the LOCAD PTS. The Requirements, Verification and Compliance (RVC) database establishes the system level requirements, the verification program, and the compliance data for the LOCAD PTS.
Purpose.
This document establishes an “end-to-end” verification program for the LOCAD PTS. The Requirements, Verification and Compliance (RVC) database establishes the system level requirements, the verification program, and the compliance data for the LOCAD PTS.
Collections
:
-
Statistics
MSFC-RQMT-3458 REV B
Show full item record
contributor author | MSFC - NASA - MSFC - Marshall Space Flight Center | |
date accessioned | 2017-09-04T18:36:16Z | |
date available | 2017-09-04T18:36:16Z | |
date copyright | 04/26/2006 | |
date issued | 2006 | |
identifier other | JKVIJBAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std;query=autho1/handle/yse/218272 | |
description abstract | The RVC database documents system level interface, performance, and safety requirements for the LOCAD PTS. These requirements are the basis for a verification program that will yield compliance data to demonstrate that the LOCAD PTS satisfies performance, functionality, safety, and interface requirements. These verification requirements will ensure that the LOCAD PTS has the capability to perform mission objectives both safely and efficiently for launch on the STS-116 (12A.1). Purpose. This document establishes an “end-to-end” verification program for the LOCAD PTS. The Requirements, Verification and Compliance (RVC) database establishes the system level requirements, the verification program, and the compliance data for the LOCAD PTS. | |
language | English | |
title | MSFC-RQMT-3458 REV B | num |
title | LAB-ON-A-CHIP APPLICATION DEVELOPMENT (LOCAD) PORTABLE TEST SYSTEM (PTS) REQUIREMENTS, VERIFICATION, & COMPLIANCE (RVC) | en |
type | standard | |
page | 191 | |
status | Active | |
tree | MSFC - NASA - MSFC - Marshall Space Flight Center:;2006 | |
contenttype | fulltext |