Show simple item record

BACKFILL FOR SUBSURFACE STRUCTURES

contributor authorUFC - Unified Facilities Criteria
date accessioned2017-09-04T17:29:01Z
date available2017-09-04T17:29:01Z
date copyright01/16/2004
date issued2004
identifier otherCQYOJBAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=autho47037D83081DAC4241668F1E350F130D0Facilities%20Engine/handle/yse/152047
description abstractPurpose and scope. This manual is for the guidance of designers, specification writers, and especially field personnel engaged in designing, planning, and conducting earthwork operations around major deep-seated or subsurface structures.
a. The greatest deficiencies in earthwork operations around deep-seated or subsurface structures occur because of improper backfilling procedures and inadequate construction control during this phase of the work. Therefore, primary emphasis in this manual is on backfilling procedures. Design and planning considerations, evaluation and selection of materials, and other phases of earthwork construction are discussed where pertinent to successful backfill operations.
b. Although the information in this manual is primarily applicable to backfilling around large and important deep-seated or buried structures, it is also applicable in varying degrees to backfilling operations around all structures, including conduits.
languageEnglish
titleUFC 3-220-04FAnum
titleBACKFILL FOR SUBSURFACE STRUCTURESen
typestandard
page60
statusActive
treeUFC - Unified Facilities Criteria:;2004
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record