IEEE Std C57.116-2022 (Revision of IEEE Std C57.116-2014)

contributor authorIEEE - The Institute of Electrical and Electronics Engineers, Inc.
date accessioned2023-08-07T18:46:43Z
date available2023-08-07T18:46:43Z
date copyright10 February 2023
date issued2023
identifier other10041007.pdf
identifier urihttp://yse.yabesh.ir/std;query=autho47037D83FCDCAC4261598F1EFDEC014A/handle/yse/329628
description abstractInformation on the selection and application considerations for the unit power transformer and unit auxiliary power transformer is provided in this guide. Consideration is given to connections that include direct connection and connections through generator circuit breakers and load-break switches. The considerations referred to in this guide apply to hydroelectric and thermal electric generating stations. Various power transformer connections and possible operating problems under normal and abnormal conditions are treated. Phasing procedures, basic impulse insulation level selection, and loading practices are not covered.
languageEnglish
titleIEEE Guide for Transformers Directly Connected to Generatorsen
titleIEEE Std C57.116-2022 (Revision of IEEE Std C57.116-2014)num
typeStandard
page57
treeIEEE - The Institute of Electrical and Electronics Engineers, Inc.:;2023
contenttypeFulltext
subject keywordsunit auxiliaries
subject keywordsIEEE C57.116
subject keywordsoverexcitation
subject keywordselectrical parameters
subject keywordsload tap changing
subject keywordsgenerator bus
subject keywordstransmission system
subject keywordsunit power transformer
subject keywordsback-feed
subject keywordsunit auxiliary transformer
subject keywordsovercurrent
subject keywordstransformer connections
identifier DOI10.1109/IEEESTD.2023.10041007