description abstractPurpose.
The purpose of this Technical Instructions (TI) is to provide design policy and technical guidance to the U.S. Army Corps of Engineers (USACE) for Army Military Construction (MILCON) projects when Code 3 design directives are released. Code 3 design directives are intended to accelerate early execution of project design, provide better definition of customer requirements, improve customer involvement, and implement the use of parametric estimating, at a minimum expenditure of Planning and Design (P&D) funds. The purpose of this TI is to define and develop the scope of a project, its site and cost requirements in sufficient details to assure the Office of the Secretary of Defense (OSD) and the Congress that the Army has an executable project.
b. Applicability.
This TI is effective immediately and applies to Major Subordinate Commands (MSC), district commands and technical centers, and other USACE field offices having MILCON responsibilities, herein referred to as the design agency. It supersedes the AEI for Project Engineering with parametric Estimating published on 6 February 1996.
languageEnglish
titleUFC 3-710-01Anum
titleCODE 3 DESIGN WITH PARAMETRIC ESTIMATINGen
typestandard
page43
statusActive
treeUFC - Unified Facilities Criteria:;2005
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record