• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ASME - ASME International
  • View Item
  •   YSE
  • Industrial Standards
  • ASME - ASME International
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

ASME PTC PM

Performance Monitoring Guidelines for Power Plants

Organization:
ASME - ASME International
Year: 2010

Abstract: The Scope includes fossil-fueled steam plants and the balance-of-plant portion of nuclear power plants. The guidelines include performance monitoring concepts, a description of various methods available, and means for evaluating particular applications.
The guidelines provide procedures for validation and interpretation of data, determination of performance characteristics and trends, determination of sources of performance problems, analysis of the performance in relation to the process, determination of losses due to degradation, possible corrective actions, and performance optimization.
The guidelines provide the necessary information for implementing a performance monitoring program, using either an automated or a manual data acquisition system, or both.
URI: http://yse.yabesh.ir/std;query=autho8B09DF4B436D3FF74ED84EA7091BD2980Facilitiess/handle/yse/153517
Collections :
  • ASME - ASME International
  • Download PDF : (30.88Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    ASME PTC PM

Show full item record

contributor authorASME - ASME International
date accessioned2017-09-04T17:30:29Z
date available2017-09-04T17:30:29Z
date copyright2010.04.30
date issued2010
identifier otherCVCESCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;query=autho8B09DF4B436D3FF74ED84EA7091BD2980Facilitiess/handle/yse/153517
description abstractThe Scope includes fossil-fueled steam plants and the balance-of-plant portion of nuclear power plants. The guidelines include performance monitoring concepts, a description of various methods available, and means for evaluating particular applications.
The guidelines provide procedures for validation and interpretation of data, determination of performance characteristics and trends, determination of sources of performance problems, analysis of the performance in relation to the process, determination of losses due to degradation, possible corrective actions, and performance optimization.
The guidelines provide the necessary information for implementing a performance monitoring program, using either an automated or a manual data acquisition system, or both.
languageEnglish
titleASME PTC PMnum
titlePerformance Monitoring Guidelines for Power Plantsen
typestandard
page248
statusActive
treeASME - ASME International:;2010
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian