Show simple item record

Inspection Planning Using Risk-Based Methods

contributor authorASME - ASME International
date accessioned2017-09-04T18:07:05Z
date available2017-09-04T18:07:05Z
date copyright2007.01.01 (R 2012)
date issued2012
identifier otherGOBJBFAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;quessionid=2A40C85753860/handle/yse/190036
description abstractThe risk analysis principles, guidance, and implementation strategies presented in this Standard are broadly applicable; however, this Standard has been specifically developed for applications involving fixed pressurecontaining equipment and components. This Standard is not intended to be used for nuclear power plant components; see ASME BPV, Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components. It provides guidance to owners, operators, and designers of pressure-containing equipment for developing and implementing an inspection program. These guidelines include means for assessing an inspection program and its plan. The approach emphasizes safe and reliable operation through cost-effective inspection. A spectrum of complementary risk analysis approaches (qualitative through fully-quantitative) should be considered as part of the inspection planning process.
languageEnglish
titleASME PCC-3num
titleInspection Planning Using Risk-Based Methodsen
typestandard
page92
statusActive
treeASME - ASME International:;2012
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record