AASHTO HB-17 DIVISION II SEC 5
Division II Construction - Drilled Piles and Shafts
Year: 2002
Abstract: DESCRIPTION
This work shall consist of constructing drilled foundation shafts, with or without bell footings, including the placing of reinforcing steel and concrete all in accordance with the plans, these specifications and the special provisions.
This work shall consist of constructing drilled foundation shafts, with or without bell footings, including the placing of reinforcing steel and concrete all in accordance with the plans, these specifications and the special provisions.
-
Statistics
AASHTO HB-17 DIVISION II SEC 5
Show full item record
| contributor author | AASHTO - American Association of State Highway and Transportation Officials | |
| date accessioned | 2017-09-04T18:48:32Z | |
| date available | 2017-09-04T18:48:32Z | |
| date copyright | 01/01/2002 | |
| date issued | 2002 | |
| identifier other | KPGOBBAAAAAAAAAA.pdf | |
| identifier uri | http://yse.yabesh.ir/std;quessionid=2A40C85753860/handle/yse/229845 | |
| description abstract | DESCRIPTION This work shall consist of constructing drilled foundation shafts, with or without bell footings, including the placing of reinforcing steel and concrete all in accordance with the plans, these specifications and the special provisions. | |
| language | English | |
| title | AASHTO HB-17 DIVISION II SEC 5 | num |
| title | Division II Construction - Drilled Piles and Shafts | en |
| type | standard | |
| page | 7 | |
| status | Active | |
| tree | AASHTO - American Association of State Highway and Transportation Officials:;2002 | |
| contenttype | fulltext |

درباره ما