Show simple item record

Lessons Learned - SRB Holddown Stud Detensioning Operation

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:38:38Z
date available2017-09-04T16:38:38Z
date copyright05/22/1992
date issued1992
identifier otherVIYCQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/102238
description abstractDescription of Driving Event:
During detensioning operations of a holddown post, while pressure of approximately 8K to 10K lbs was being applied, a loud "bang" was heard. Pressure on the tensioner fell to zero. It was later determined that the loud "bang" was the result of thread failure between the puller bar socket and the SRB holddown stud. With only 8 threads engaged, the shear stresses increased to 96,000 psi, as compared to 98,000 psi shear strength of the stud. Examination of the holddown stud revealed that 8 threads sheared on a 135 degree circumferential segment of the holddown stud.
languageEnglish
titleNASA-LLIS-0080num
titleLessons Learned - SRB Holddown Stud Detensioning Operationen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1992
contenttypefulltext
subject keywordsHardware
subject keywordsLaunch Process
subject keywordsLaunch Vehicle
subject keywordsPackaging Handling Storage
subject keywordsParts Materials & Processes


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record