Show simple item record

Gulf of Mexico Jackup Operations for Hurricane Season - First Edition

contributor authorAPI - American Petroleum Institute
date accessioned2017-09-04T16:40:15Z
date available2017-09-04T16:40:15Z
date copyright06/01/2006 (R 2008)
date issued2008
identifier otherVNELCCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/103925
description abstractThe purpose of this recommended practice (RP) is to present an approach to siting Jackup Mobile Offshore Drilling Units (MODUs) and to recommend certain operational procedures to enhance jackup survivability and stationkeeping during hurricane season in the Gulf of Mexico during drilling, workover, and while stacked (idled) at a non-sheltered location. This document provides guidance and processes and, when combined with an understanding of the environment at a particular location, the characteristics of the unit being utilized, and other factors, may be used to enhance operational integrity. This RP was developed through a cooperative arrangement with the International Association of Drilling Contractors' (IADC) Jackup Rig Committee. The information presented herein is premised on the existence of an evacuation plan, the intent of which is to assure timely evacuation of all rig personnel in anticipation of certain climatic conditions.
languageEnglish
titleAPI RP 95Jnum
titleGulf of Mexico Jackup Operations for Hurricane Season - First Editionen
typestandard
page24
statusActive
treeAPI - American Petroleum Institute:;2008
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record