Show simple item record

Lessons Learned – Core Competency of Subcontractors

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:02:22Z
date available2017-09-04T17:02:22Z
date copyright08/01/2000
date issued2000
identifier otherBXTEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/125913
description abstractDescription of Driving Event:
The POES Program made a decision to embellish an instrument by incorporating a new scanner design. This new design was to replace a weak motor with a stronger one that would have the same operational performance. In doing this, the motor and the drive electronics had to be replaced. The Prime Instrument contractor always subcontracts out the build of the motors, and this time the decision was made to allow the motor vendor to build the control electronics as well as the motor. The build of the control electronics was a new venue for the motor vendor and made an equitable offer to the Prime for both the motor and the control electronics. The vendor was never able to produce the control electronics and that activity had to be brought back in-house by the Prime. As a consequence, the modification experienced a significant over-run and substantial delays in the delivery of the units.
languageEnglish
titleNASA-LLIS-0907num
titleLessons Learned – Core Competency of Subcontractorsen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2000
contenttypefulltext
subject keywordsConfiguration Management
subject keywordsFlight Equipment
subject keywordsParts Materials & Processes
subject keywordsRisk Management/Assessment


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record