NASA-LLIS-1491
Lessons Learned – Thorough Risk Assessment in the Design Phase
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T17:08:40Z | |
| date available | 2017-09-04T17:08:40Z | |
| date copyright | 04/26/2004 | |
| date issued | 2004 | |
| identifier other | YKWEQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/132140 | |
| description abstract | Abstract: In November of 2003, the NASA Engineering and Safety Center (NESC) performed an Independent Technical Assessment of the Code Y CALIPSO satellite Proteus propulsion bus (ref. NESC Final Report NESC-RP-001, NASA Technical Memorandum number applied for). This is a joint mission with NASA GSFC, LaRC and the Centre National d'Etudes Spatiales (CNES) scheduled to launch from Vandenberg Air Force base in April 2005 on a Delta II rocket. Several personnel safety hazards related to the hydrazine-fueled Proteus propulsion bus could have been minimized or avoided in the design phase. | |
| language | English | |
| title | NASA-LLIS-1491 | num |
| title | Lessons Learned – Thorough Risk Assessment in the Design Phase | en |
| type | standard | |
| page | 3 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;2004 | |
| contenttype | fulltext | |
| subject keywords | Flight Equipment | |
| subject keywords | Ground Operations | |
| subject keywords | NASA Standards | |
| subject keywords | Program and Project Management | |
| subject keywords | Range Operations | |
| subject keywords | Risk Management/Assessment | |
| subject keywords | Spacecraft |