Lessons Learned - Verification of Baseline Configuration before Modification, Upkeep of Maintenance and Operational Logs, Operation Condition Effects, Upkeep Documentation, Safety System Checks

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:10:36Z
date available2017-09-04T17:10:36Z
date copyright05/05/1989
date issued1989
identifier otherYQBEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/134116
description abstractDescription of Driving Event:
On January 25, 1984, the National Geotechnical Centrifuge, located at NASA Ames Research Center, experienced a catastrophic failure of the 18,000 horsepower drive motor thrust bearing. The failure permitted the 100 ton drive motor armature to drop, the centrifuge to stop, and resulted in extensive electrical and mechanical damage. Repairs may take one year, and cost estimated at $550,000.
languageEnglish
titleNASA-LLIS-0494num
titleLessons Learned - Verification of Baseline Configuration before Modification, Upkeep of Maintenance and Operational Logs, Operation Condition Effects, Upkeep Documentation, Safety System Checksen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1989
contenttypefulltext
subject keywordsConfiguration Management
subject keywordsLogistics
subject keywordsSafety & Mission Assurance
subject keywordsTest Facility