Lesson Learned - Verify Test Equipment Functionality Before Testing

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:13:31Z
date available2017-09-04T17:13:31Z
date copyright08/28/2012
date issued2012
identifier otherYYFRAFAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/136965
description abstractA failure in the system-level testing of the MSL Robotic Arm was traced to GSE wiring that was mis-connected. Because re-test was not feasible, the functionality was verified by analysis. For system-level thermal testing during ATLO, the functionality of all GSE instrumentation should be unequivocally verified prior to closing the chamber doors.
languageEnglish
titleNASA-LLIS-6696num
titleLesson Learned - Verify Test Equipment Functionality Before Testingen
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2012
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record