NASA-LLIS-4416
Critical System Maturity Requirements, Critical System Analytic Model, and Critical System Certification Proces
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T15:16:58Z | |
| date available | 2017-09-04T15:16:58Z | |
| date copyright | 08/13/2012 | |
| date issued | 2012 | |
| identifier other | MLIKYEAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/16319 | |
| description abstract | It is important to establish the environment in which equipment is to operate prior to designing or specifying it. Once the design or specification is set, NASA should not forego certification testing as this may give rise to continuing costs over the life of the program. | |
| language | English | |
| title | NASA-LLIS-4416 | num |
| title | Critical System Maturity Requirements, Critical System Analytic Model, and Critical System Certification Proces | en |
| type | standard | |
| page | 2 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;2012 | |
| contenttype | fulltext |

درباره ما