CSA N285.5-13
Periodic inspection of CANDU nuclear power plant containment components - Fourth Edition
| contributor author | CSA - CSA Group | |
| date accessioned | 2017-09-04T17:54:58Z | |
| date available | 2017-09-04T17:54:58Z | |
| date copyright | 2013.07.01 | |
| date issued | 2013 | |
| identifier other | FIQYFFAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/178100 | |
| description abstract | This Standard specifies requirements for the periodic inspection of containment system components, including containment pressure suppression systems, in CANDU nuclear power plants. The inspection requirements specified in this Standard (see Annex B for additional guidance) provide assurance of the structural integrity of metallic and plastic containment system components. Note: The following are addressed by other Standards or procedures as specified in Table 1: a) leak tightness and operability requirements; and b) inspection and testing requirements for concrete, embedded parts, and elastomeric seals. Periodic inspection, material property monitoring, and test programs for fiberglass reinforced plastic (FRP) containment components are included in Annex A. | |
| language | English | |
| title | CSA N285.5-13 | num |
| title | Periodic inspection of CANDU nuclear power plant containment components - Fourth Edition | en |
| type | standard | |
| page | 59 | |
| status | Active | |
| tree | CSA - CSA Group:;2013 | |
| contenttype | fulltext |

درباره ما