Show simple item record

Guideline to Commissioning Smoke Management Systems

contributor authorASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
date accessioned2017-09-04T18:08:47Z
date available2017-09-04T18:08:47Z
date copyright01/27/1994 (R 2001)
date issued2001
identifier otherGSRXTAAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/191801
description abstractThis guideline covers all types of smoke management systems and the
(a) documentation of occupancy and use requirements and system design assumptions;
(b) documentation of design intent, system description, and operation;
(c) functional performance testing and documentation necessary for evaluating system acceptance; and
(d) integration testing with other building systems that affect the performance of the smoke management system, such as fire detection and alarm, HVAC, controls, power supplies, and separations.
Methods of commissioning HVAC and other building systems are not covered in this guideline except as provided in 2.1(d). Methods for commissioning of HVAC systems are given in ASHRAE Guideline 1-1989.
languageEnglish
titleASHRAE GUIDELINE 5num
titleGuideline to Commissioning Smoke Management Systemsen
typestandard
page15
statusActive
treeASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2001
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record