Criteria for Flight and Flight Support Systems Lifecycle Reviews

contributor authorGSFC - NASA - GSFC - Robert H. Goddard Space Flight Center
date accessioned2017-09-04T15:40:53Z
date available2017-09-04T15:40:53Z
date copyright40087
date issued2009
identifier otherPFDNUEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/43137
description abstractPurpose
The guidelines and criteria contained in this document are intended for use by the project team, the GSFC System Review Office (SRO), the Independent Program Assessment Office (IPAO), and the Chair of the NASA appointed Standing Review Board (SRB) in support of planning and implementing the reviews conducted under the authority of each organization. Such reviews range from subsystem and functional reviews to the mission-level reviews, many of which serve as Key Decision Point (KDP) gateways. The criteria defined in this document have been developed to encompass those specified by NPR 7123.1.
As a supplement to this document, the GSFC STD-1001- Appendix, "Lifecycle Review Success Criteria Key Evaluation Factors", provides sample evaluation factors intended to be used in assessing the project's achievements toward meeting the success criteria in the development of associated system. The sample lists are organized by review type (i.e., SRR, PDR, CDR, PER, etc.) and are a compilation of evaluation factors acquired from lesson's learned and NASA best practices. Key evaluation factors may be tailored to suit the needs of the individual project. They are typically provided as reference material to the project in support of review preparation and to the independent review panels to support the conduct of the review (agenda definition, line of questioning, etc.). The Key Evaluation Factors are not success criteria for the associated review.
Applicability
This document describes the mission and lower level element reviews (e.g., spacecraft, instrument, ground system, operations, etc.) conducted during the development and operations lifecycle for Goddard Space Flight Center (GSFC) managed projects, and incorporates the requirements for:
(a) Agency-level mission reviews as prescribed by National Aeronautics and Space Administration (NASA) Procedural Requirement (NPR) 7120.5D, "NASA Space Flight Program and Project Management Requirements" and NPR 7123.1, "NASA Systems Engineering Processes and Requirements",
(b) Center unique mission, flight, and flight support system reviews as prescribed by GSFC Procedural Requirement (GPR) 8700.4, "Integrated Independent Reviews", the results of which are flowed up to the Agency level reviews that are conducted in support of the Agency level mission reviews at a lower level.
The Project/Product Manager should use this guide when preparing the Systems Review Plan (SRP) for conducting a comprehensive set of mission, spacecraft, instrument and ground system reviews as required by Agency and GSFC review process documents. In collaboration with the Systems Review Manager (SRM), the IPAO appointed Review Manager (RM) and SRB Chair should use this document to assess compliance with unique Agency requirements and to prepare the Terms of Reference (ToR) that documents the charter of the SRB.
languageEnglish
titleGSFC-STD-1001 REV Anum
titleCriteria for Flight and Flight Support Systems Lifecycle Reviewsen
typestandard
page126
statusActive
treeGSFC - NASA - GSFC - Robert H. Goddard Space Flight Center:;2009
contenttypefulltext