description abstractAbstract:
The over-current detection scheme for Deep Impact spacecraft heater circuitry failed to detect an over-current condition during ground test due to an inadequate circuit design and test design. The root cause was inadequate contractor oversight and peer review. The lessons learned from the MCO mission loss on the value of detailed technical review and contractor oversight must be re-emphasized, and test configurations should be subjected to FMEA and feature positive controls limiting electrical current.
languageEnglish
titleNASA-LLIS-1620num
titleLessons Learned – Deep Impact Reiterates the Need for Peer Review and Contractor Oversighten
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2005
contenttypefulltext
subject keywordsdesign error
subject keywordsFlight Equipment
subject keywordsGround Equipment
subject keywordsGround Operations
subject keywordsHardware
subject keywordsopto-coupler
subject keywordsovercurrent detection
subject keywordsovercurrent protection
subject keywordsPayloads
subject keywordsSpacecraft
subject keywordsTest & Verification
subject keywordsTest Article
subject keywordstest damage
subject keywordstest-induced failure