Show simple item record

ELECTRIC PLANT INSTALLATION STANDARD METHODS FOR SURFACE SHIPS AND SUBMARINES (PENETRATIONS)

contributor authorNAVY - SH - Naval Sea Systems Command (Ship Systems)
date accessioned2017-09-04T15:07:49Z
date available2017-09-04T15:07:49Z
date copyright09/03/2009
date issued2009
identifier otherLJIJOCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/5690
description abstractThis standard covers standard methods for swage tubes, stuffing tubes, and kickpipes on surface ships and submarines.
Application. These installation methods are to be used by all installing activities. These methods do not identify ship or type, but do establish minimum standards of acceptance for Naval ships. It is the responsibility of the user activity to determine which method satisfies their requirements. It does not authorize relaxation of any requirement specifically invoked by new construction, conversion, overhaul, or refurbishment contracts. In instances where deviated design requirements (for example, ship type, ship class, and so forth) conflict with the requirements of this standard, the requirements of this standard govern. Any deviation for electric plant installation identified in this standard is to be submitted to NAVSEA 05Z3 for resolution.Intended Use: This section specifies the requirements for swage tubes, stuffing tubes, and kickpipe methods to be employed both on surface ships and submarines. Standard methods identified for electric plant installation are intended for new construction, conversion, and alteration of existing ships
languageEnglish
titleMIL-STD-2003-3Anum
titleELECTRIC PLANT INSTALLATION STANDARD METHODS FOR SURFACE SHIPS AND SUBMARINES (PENETRATIONS)en
typestandard
page198
statusActive
treeNAVY - SH - Naval Sea Systems Command (Ship Systems):;2009
contenttypefulltext
subject keywordsKickpipes
subject keywordsMulti-cable transits
subject keywordsStuffing tubes


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record