Show simple item record

Lessons Learned - Communicate Requirements Associated with Analysis Tied to Required Verification Data

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:54:33Z
date available2017-09-04T15:54:33Z
date copyright06/25/2012
date issued2012
identifier otherQSSBXEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/57922
description abstractA specific analysis was required to be performed by a contractor in support of design, development, verification, and validation of ARES 1-X hardware. The Systems Engineering and Integration (SE&I) group of the prime contractor failed to adequately communicate the requirements associated with an analysis, including a requirement to use specific, approved sources for material capability properties with test-verified certainty boundaries (variation dispersions) for use in design analysis to the subcontract engineering group that performed the analysis. The analysis was completed without being verified by the subcontractor or prime contractor that the analysis methodology and assumptions complied with contractually stipulated verification data deliverable requirements. The error was found during a late life-cycle review, and the government engineering team was tasked to complete the proper analysis and documentation under extreme time constraints to ensure proper verification of the design. The additional unplanned work added cost and time delay to the budget and schedule.
languageEnglish
titleNASA-LLIS-6536num
titleLessons Learned - Communicate Requirements Associated with Analysis Tied to Required Verification Dataen
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2012
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record