Lessons Learned - Lift Operations Utilizing a Hydraset or Dynamomete

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:02:31Z
date available2017-09-04T16:02:31Z
date copyright08/03/1992
date issued1992
identifier otherRNYCQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/65717
description abstractDescription of Driving Event:
Replacement of the upper floating beam forward roller support shaft was in progress to eliminate a stress corrosion concern. The 5-ton bridge crane and a sling were being used to lift the Pad B PGHM side 2 upper floating beam Z bar off of the Z roller when a small block with two 5/8" bolts apparently sheared, allowing Z Bar to travel up, contacting a portion of the upper floating beam causing the web strap to be cut.
languageEnglish
titleNASA-LLIS-0096num
titleLessons Learned - Lift Operations Utilizing a Hydraset or Dynamometeen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1992
contenttypefulltext
subject keywordsFacilities
subject keywordsHardware
subject keywordsLifting Devices