PARTS, MATERIALS, AND PROCESSES CONTROL PROGRAM FOR EXPENDABLE LAUNCH VEHICLES

contributor authorAIR FORCE - 02 - Air Force Network Integration Center (AFNIC)
date accessioned2017-09-04T15:09:28Z
date available2017-09-04T15:09:28Z
date copyright06/13/2008
date issued2008
identifier otherLODQJEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/7550
description abstractPURPOSE
This document establishes the requirements for the preparation, implementation, and operation of a parts, materials, and processes control program for use during the design, development, and production of expendable launch vehicles (ELV). The implementation of these requirements is intended to:
a. Assure integrated management of the selection, application, procurement, control, and standardization of parts, materials, and processes (PMP).
b. Improve the reliability of program PMP to reduce PMP failures at all levels of assembly and test.
c. Reduce program life cycle cost.
d. Improve procurement and test of small quantities of parts and materials that meet system requirements
APPLICATION
This document is intended for use in acquisition contracts for launch vehicle programs. The document should be cited in the contract schedule or the statement of work. The document defines the minimum acceptable requirements for ELV applications and as such shall not be tailored except where allowed by the PMPCB as specified herein. The requirements are intended to be used to coordinate at the program level the selection, application, management, and procurement of PMP throughout the design, development, and production cycles of an acquisition.
languageEnglish
titleSMC-S-011num
titlePARTS, MATERIALS, AND PROCESSES CONTROL PROGRAM FOR EXPENDABLE LAUNCH VEHICLESen
typestandard
page213
statusActive
treeAIR FORCE - 02 - Air Force Network Integration Center (AFNIC):;2008
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record