Show simple item record

Lessons Learned – Genesis Canister Lift Incident (2000)

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:25:27Z
date available2017-09-04T16:25:27Z
date copyright07/20/2000
date issued2000
identifier otherTXTEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/88696
description abstractAbstract:
Genesis: In 2000 the Genesis canister detached from a lift fixture fitting just prior to system-level thermal vacuum testing. Fabrication or test organizations should inspect all MGSE for fastener engagement and specified torque prior to delivery for use by a project. Where feasible, threaded components that are to be placed under tension should be designed with a positive locking device. Flight projects should conduct and document visual and physical inspections of MGSE prior to use. Personnel safety should be addressed, as appropriate, by all procedures. In addition, all test personnel should constantly remain at a safe distance during operations involving suspended loads.
languageEnglish
titleNASA-LLIS-0914num
titleLessons Learned – Genesis Canister Lift Incident (2000)en
typestandard
page4
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2000
contenttypefulltext
subject keywordsCrane
subject keywordsGround Equipment
subject keywordsHardware
subject keywordsIndustrial Safety
subject keywordsLift Procedure
subject keywordsLifting Devices
subject keywordsMechanical Integration
subject keywordsNDI
subject keywordsNondestructive Inspection
subject keywordsPackaging Handling Storage
subject keywordsQuality Assurance
subject keywordsSafety & Mission Assurance
subject keywordsSystem Integration and Test
subject keywordsSystem Safety
subject keywordsTest Facility
subject keywordsTest Procedures


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record