Show simple item record

Coiled Tubing Well Control Equipment Systems - First Edition

contributor authorAPI - American Petroleum Institute
date accessioned2017-09-04T16:28:43Z
date available2017-09-04T16:28:43Z
date copyright03/01/2009
date issued2009
identifier otherUGSNLCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/91945
description abstractGeneral
This recommended practice (RP) addresses coiled tubing well control equipment assembly and operation as it relates to well control practices. Industry practices for performing well control operations using fluids for hydrostatic pressure balance are not addressed in this RP.
This document covers well control equipment assembly and operation used in coiled tubing intervention and coiled tubing drilling applications performed through:
— christmas trees constructed in accordance with API 6A and/or API 11IW,
— a surface flow head or surface test tree constructed in accordance with API 6A,
— drill pipe or workstrings with connections manufactured in accordance with API 7 and/or API 5CT.
Operations Not Covered in this Document
The following operations are not covered in the scope of this document:
coiled tubing well intervention operations without the christmas tree (or surface test tree) in place,
coiled tubing drilling operations without the christmas tree (or surface test tree) in place,
capillary tubing (tubing less than 3/4 in. OD) well service operations,
coiled tubing intervention operations within pipelines and flowlines,
reverse circulation operations.
languageEnglish
titleAPI RP 16STnum
titleCoiled Tubing Well Control Equipment Systems - First Editionen
typestandard
page90
statusActive
treeAPI - American Petroleum Institute:;2009
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record