Show simple item record

Lessons Learned – GHe Purging of Hydrogen Systems

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:16:23Z
date available2017-09-04T17:16:23Z
date copyright04/01/2000
date issued2000
identifier otherZFTEQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/139833
description abstractPractice:
Prior to venting a hydrogen (H2) system, initiate a gaseous helium (GHe) sweep purge to evacuate air from the vent line. After venting operations are complete, initiate a second GHe sweep purge to evacuate the vent system of residual H2. Use a flapper valve or check valve on the vent line to prevent air intrusion into the line during low or intermittent flow conditions.
languageEnglish
titleNASA-LLIS-0851num
titleLessons Learned – GHe Purging of Hydrogen Systemsen
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2000
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record