Search
Now showing items 1-3 of 3
ACI 306R: Guide to Cold Weather Concreting
Abstract: INTRODUCTION
Cold weather exists when the air temperature has fallen to, or is expected to fall below 40°F (4°C) during the protection period. The protection period is defined as the time ...
Cold weather exists when the air temperature has fallen to, or is expected to fall below 40°F (4°C) during the protection period. The protection period is defined as the time ...
ACI 347.2R: Guide for Shoring/Reshoring of Concrete Multisory Buildings
Abstract: INTRODUCTION
In multistory cast-in-place concrete building construction, freshly cast floors are placed on formwork that is temporarily supported by a system of shores and reshores until the concrete ...
In multistory cast-in-place concrete building construction, freshly cast floors are placed on formwork that is temporarily supported by a system of shores and reshores until the concrete ...
ACI C-26: Formwork
Abstract: Preface
ACI Compilations combine material previously published in Institute periodicals to provide compact and ready reference on specific topics. The Material in a compilation does not necessarily ...
ACI Compilations combine material previously published in Institute periodicals to provide compact and ready reference on specific topics. The Material in a compilation does not necessarily ...