Guide for Specifying Underground Shotcrete

contributor authorACI - American Concrete Institute
date accessioned2017-09-04T16:03:47Z
date available2017-09-04T16:03:47Z
date copyright08/01/2009
date issued2009
identifier otherBHDCOCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/67089
description abstractThis guide is intended for owner, designer, specifier, and inspection and testing personnel interested in or in need of information and background on the application of underground shotcrete. The guide briefly discusses the concept of composite ground support—the combination of shotcrete and other support elements used to provide early and effective tunnel support. The guide is not a comprehensive treatise on the design of these systems, but is intended to provide sufficient information to understand how the combination and sequencing of ground support elements can influence the performance, application, inspection, and testing of shotcrete.
The general format of the document is such that each section provides a brief introductory overview followed by a table that contains points considered important to specifications (Example Specifications) and brief notes to the specifier where necessary. The reader should, however, recognize that each underground project is unique, and that the example specifications and notes to the specifier provided need to be considered in that context.
Although this guide is written to those users typically involved with civil projects involving shotcrete, it is equally applicable to users involved with shotcrete in the underground mining industry. Whereas terms such as owner, specifier, and contractor are ubiquitous for civil projects, these key players are nonetheless involved in mining; however, they are typically one or more individuals, groups, or entities within the mining company, and may be referred to as engineering, production, or quality control.
Measurements in this document are presented in inchpound units (followed by SI units in parentheses). Table 1.1 contains the constants that were used to convert inch-pound units to SI and vice versa. Due to issues of rounding, significant figures, and the dimensions of locally available products, the values resulting from conversion may be misleadingly precise.
languageEnglish
titleACI 506.5Rnum
titleGuide for Specifying Underground Shotcreteen
typestandard
page56
statusActive
treeACI - American Concrete Institute:;2009
contenttypefulltext
subject keywordsacceptance criteria
subject keywordsbatching
subject keywordsinspection
subject keywordsmethods of payment
subject keywordsmine and tunnel support systems
subject keywordsmixing and placement equipment
subject keywordsmixture proportioning
subject keywordspreconstruction and construction testing
subject keywordsquality assurance
subject keywordsquality control
subject keywordssafety
subject keywordsshotcrete
subject keywordsshotcrete application