ADS-63-SP
RADAR SYSTEM AIRWORTHINESS QUALIFICATION AND VERIFICATION REQUIREMENTS
Organization:
ARMY - AV - Aviation and Missile Command
Year: 2001
Abstract: This document establishes the verification methods and qualification requirements for radar systems installed on U.S. Army aircraft. A combination of analyses, component testing, ground testing, and flight testing, will verify the design, installations and performance of the radar subsystem prior to the formal Airworthiness Qualification Release. The Airworthiness Qualification program encompasses: a. Design reviews. b. Engineering design substantiation analyses. c. Contractor development and airworthiness qualification tests, including component, subsystem and system testing. d. Government systems development and airworthiness qualification testing, including: (1) Preliminary Airworthiness Evaluation (PAE). (2) Airworthiness and Flight Characteristics Test (A&FC).
e. Government Operational Testing (OT) if required by the approved Test Engineering Master Plan (TEMP).
e. Government Operational Testing (OT) if required by the approved Test Engineering Master Plan (TEMP).
Collections
:
Show full item record
contributor author | ARMY - AV - Aviation and Missile Command | |
date accessioned | 2017-09-04T17:36:22Z | |
date available | 2017-09-04T17:36:22Z | |
date copyright | 07/11/2001 | |
date issued | 2001 | |
identifier other | DKOPJBAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std;jse/handle/yse/159314 | |
description abstract | This document establishes the verification methods and qualification requirements for radar systems installed on U.S. Army aircraft. A combination of analyses, component testing, ground testing, and flight testing, will verify the design, installations and performance of the radar subsystem prior to the formal Airworthiness Qualification Release. The Airworthiness Qualification program encompasses: a. Design reviews. b. Engineering design substantiation analyses. c. Contractor development and airworthiness qualification tests, including component, subsystem and system testing. d. Government systems development and airworthiness qualification testing, including: (1) Preliminary Airworthiness Evaluation (PAE). (2) Airworthiness and Flight Characteristics Test (A&FC). e. Government Operational Testing (OT) if required by the approved Test Engineering Master Plan (TEMP). | |
language | English | |
title | ADS-63-SP | num |
title | RADAR SYSTEM AIRWORTHINESS QUALIFICATION AND VERIFICATION REQUIREMENTS | en |
type | standard | |
page | 17 | |
status | Active | |
tree | ARMY - AV - Aviation and Missile Command:;2001 | |
contenttype | fulltext |