MSFC-PLAN-3084 REV A
REQUIREMENTS VERIFICATION PLAN PORTABLE FAN ASSEMBLY FOR THE INTERNATIONAL SPACE STATION
Organization:
MSFC - NASA - MSFC - Marshall Space Flight Center
Year: 2001
Abstract: VERIFICATION
General Requirements
The verification program shall ensure that the Portable Fan Assembly (PFA) conforms to the design and performance requirements defined in Section 3 of MSFC-SPEC-2763B. These verification requirements include interface, safety, and performance requirements, which shall be verified by inspection, analysis, demonstration and test as defined in Section 1.2. Table 1 presents a verification matrix that assigns responsibilities for the verification activities.
The test condition tolerances and ambient conditions will be as specified in MSFC-SPEC-2763B. This document is attached in Appendix C. All verification activities will be performed at MSFC.
General Requirements
The verification program shall ensure that the Portable Fan Assembly (PFA) conforms to the design and performance requirements defined in Section 3 of MSFC-SPEC-2763B. These verification requirements include interface, safety, and performance requirements, which shall be verified by inspection, analysis, demonstration and test as defined in Section 1.2. Table 1 presents a verification matrix that assigns responsibilities for the verification activities.
The test condition tolerances and ambient conditions will be as specified in MSFC-SPEC-2763B. This document is attached in Appendix C. All verification activities will be performed at MSFC.
Collections
:
-
Statistics
MSFC-PLAN-3084 REV A
Show full item record
contributor author | MSFC - NASA - MSFC - Marshall Space Flight Center | |
date accessioned | 2017-09-04T18:24:20Z | |
date available | 2017-09-04T18:24:20Z | |
date copyright | 07/31/2001 | |
date issued | 2001 | |
identifier other | IGKEIBAAAAAAAAAA.pdf | |
identifier uri | http://yse.yabesh.ir/std;jsery=autho1216AF679D40527318548F1EFDEC014A/handle/yse/206719 | |
description abstract | VERIFICATION General Requirements The verification program shall ensure that the Portable Fan Assembly (PFA) conforms to the design and performance requirements defined in Section 3 of MSFC-SPEC-2763B. These verification requirements include interface, safety, and performance requirements, which shall be verified by inspection, analysis, demonstration and test as defined in Section 1.2. Table 1 presents a verification matrix that assigns responsibilities for the verification activities. The test condition tolerances and ambient conditions will be as specified in MSFC-SPEC-2763B. This document is attached in Appendix C. All verification activities will be performed at MSFC. | |
language | English | |
title | MSFC-PLAN-3084 REV A | num |
title | REQUIREMENTS VERIFICATION PLAN PORTABLE FAN ASSEMBLY FOR THE INTERNATIONAL SPACE STATION | en |
type | standard | |
page | 251 | |
status | Active | |
tree | MSFC - NASA - MSFC - Marshall Space Flight Center:;2001 | |
contenttype | fulltext |